Overview
This project was to 4500 LF of buried 3″ Diesel and Gasoline line from the beach Barge Header to the fuel tanks. We hauled in 4,000 yards of material to fill in a few depressions along the fuel line. Cathodic Protection was also installed on the fuel line. We abandoned the old fuel line in place and pigged it to clean out the old fuel inside.
Gambell Alaska 2020